STAVO-ING

slovensky anglicky
 
Poly-functional building, Krasovského street, Petržalka, Bratislava

Over-standard equipment includes:
  • entrance to the object just through the reception
  • plastic windows with ventilating grates
  • thermo-isolating doubleglasses
  • living room and dinner room created by vitreous walls
  • floor fumigation (every flat has its own boiler and watter accumulator)
  • ceramic pavment and ceramic wall tiling including sanitary-technical equipment according to your wish
  • possibility to connect to an intelligent flat control
  • PC net, internet connection
  • iemergency fire-fighting door
  • system of security cameras
  • administration rooms equiped by airconditioning

<< additional data ground plan >>